Baltic Power intends to conduct and invites interested parties to participate in a Request for Information (RFI) for the services to be provided by Marine Warranty Surveyor (MWS) for the project. The services will be provided for the construction period of the offshore wind farm, which is planned to be conducted between 2024 and 2026.

The MWS should satisfy the requirements of the Contactor’s All Risk (CAR) insurance policy for all the transportation and installation operations for all the OWF components:

  • Foundations (FOU);
  • Wind Turbine Generators (WTG);
  • Offshore Substation (OSS);
  • Inter Array Cables (IAC);
  • Export Cables (EC)

To be considered for invitation to the RFI, interested parties should be able to demonstrate a track record of providing Marine Warranty Services for EPCI projects in the above scopes.

A company presentation and relevant references (project details, scope covered, dates/duration) should be send to Baltic Power no later than 5 November 2021 at the following e-mail address: offshoresuppliers@balticpower.pl