PROJECTS
PROJECTS
LATEST ARTICLES
From construction site to 30-year job: what Baltic Power’s operations phase means for Łeba
Baltic Power's construction ends in the second half of 2026 and the Łeba base pivots to roughly 30 years of operations. The open question is whether it becomes a single-farm service base or the anchor of a Baltic O&M cluster.
Scatec enters Romanian onshore wind as quarterly output rises 21 per cent
Scatec is moving into Romanian onshore wind, broadening a largely solar portfolio, and reported second-quarter power production up 21 per cent year on year.
EnBW completes turbine installation at Germany’s largest offshore wind farm
All 64 Vestas 15 MW turbines are installed at EnBW's 960 MW He Dreiht, Germany's largest offshore wind farm, built without subsidy and backed by corporate PPAs.
Baltica 2 turns to secondary steel as 400 components follow the foundations
With 111 foundations in place at Baltica 2, more than 400 secondary steel units follow — around 75 per cent of them made in Poland — in work running to the end of 2026.
Eurowind Energy buys two permitted German wind farms totalling 86.7 MW
Eurowind Energy has bought two permitted onshore wind projects in Brandenburg and Mecklenburg-Western Pomerania totalling 86.7 MW across thirteen turbines.
Baltica 2 completes monopile campaign with all 111 foundations installed
PGE and Ørsted have installed all 111 monopile foundations at the 1.5 GW Baltica 2 offshore wind farm on schedule. Secondary steel work now runs to the end of 2026, with turbines due in 2027.
France commits €58m to Brest as floating wind assembly hub
BrestPort has secured over €58 million from France 2030 to convert its offshore renewables terminal for floating wind assembly, with Lorient taking on mooring logistics and maintenance.
Princess Elisabeth Island foundation works finish with 23rd caisson in place
The 23rd and final caisson is in place at the Princess Elisabeth Energy Island off Belgium, completing foundation works. Cable connections follow in 2027–2028, with full completion due in 2031.
Nordex wins 82 MW of community wind orders in Lower Saxony
Nordex will supply twelve turbines totalling around 82 MW for community wind projects at Erlte-Endel and the Bad Essen cluster in Lower Saxony, with commissioning planned for spring 2028.
What ‘first power to the grid’ actually means: inside offshore wind commissioning
"First power to the grid" sounds like flipping a switch, but it is the visible tip of offshore wind commissioning — a sequence running from seabed surveys and cable trenching to onshore substation tests and grid-operator compliance. Baltic Power and Baltica 2 show how it works.
The Świnoujście Offshore Terminal: how Poland’s first installation port works
Poland's first purpose-built offshore wind installation port anchors a supply chain forming along the West Pomeranian coast. A look at how installation terminals work and why they set the pace of the build-out.
ENOVA completes repowering of Gehrde wind farm in Lower Saxony
ENOVA has finished repowering its Gehrde wind farm near Osnabrück, replacing four 2002-era Enercon E-66 turbines with three E-138 machines for a combined 12.6 MW.
Nordex wins 525 MW turbine order in Turkey, its largest single order in the market
Nordex has won an order for around 525 MW — 72 N175/6.X turbines — from Türkerler Holding for the YEKA-5 Sivas project, its largest single order in Turkey.
Nordex to supply 77 MW Urleasca wind farm in Romania for OX2
Nordex will supply 11 N175/6.X turbines for OX2's 77 MW Urleasca wind farm in Romania, now sold to Scatec, with construction starting in Q3 2026.
VSB completes Vockenrod wind farm expansion in Hesse, bringing it to 28.5 MW
VSB has finished the Vockenrod wind farm expansion in Hesse, adding two Nordex N149-5.X turbines to reach five machines and 28.5 MW in total.



















































































































































































































































































































































































































































































































































































































































































































































































































































































































































































