Nordex wins 34 MW repowering order in Hesse with N175/6.X turbines on 199-metre towers
Nordex will replace five 3 MW turbines at the Rauschenberg wind farm in Hesse with five 6.8 MW N175/6.X machines on 199-metre towers for developer EEF, with generation due from summer 2028.